2CCP Series Cable Pull Switches:
25 Products FoundCable-Pull Safety Switches
The 2CCP, Honeywell’s newest MICRO SWITCH Cable-Pull Safety Switch, provides an economical switching solution for an easily accessible emergency stop function along conveyors and machines. The 2CCP provides reliable performance, a highly configurable platform, easy installation, simplified maintenance, and faster equipment restart to meet the needs of a wide range of end-users.
- Dual direction
- Improved design for LED and tension windows
- Updated design to easily and economically replace faceplate
- All options in one package size
- Shock: 15 g
- Sealing: IP54, NEMA 1
- Vibration: 10 Hz to 500 Hz, 5 g
- Mechanical life: 375,000 operations
- Operating temperature range: -40 °C to 85 °C [-40 °F to 185 °F]
- Applications: Long conveyor systems, Large machinery, Industrial plants
View
Buyer
Engineer
Manufacturer
Cable Span
Contact Configuration
Contact Voltage AC Max
Contact Current AC Max
Contact Voltage DC Max
Contact Current DC Max
Product Range
Packaging
Filter(s) Applied
1 Filter(s) Selected
| Compare | Price for | Quantity | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
38AJ0198 | Each | 5+ $535.510 10+ $519.200 25+ $483.860 50+ $459.390 | Min: 5 / Mult: 5 | 500ft | DPST-NO, DPST-NC | 120V | 6A | 24V | 2.8A | 2CCP Series | ||||
Each | 1+ $654.650 5+ $635.310 10+ $615.960 25+ $574.030 50+ $545.010 | Min: 1 / Mult: 1 | 500ft | DPST-NO, DPST-NC | 120V | 6A | 24V | 2.8A | 2CCP Series | |||||
Each | 1+ $546.640 5+ $530.480 10+ $514.320 25+ $479.320 50+ $455.080 | Min: 1 / Mult: 1 | 500ft | DPST-NO, DPST-NC | 120V | 6A | 24V | 2.8A | 2CCP Series | |||||
Each | 1+ $608.510 5+ $590.530 10+ $572.540 25+ $533.570 50+ $506.590 | Min: 1 / Mult: 1 | 500ft | DPST-NO, DPST-NC | 120V | 6A | 24V | 2.8A | 2CCP Series | |||||
Each | 1+ $546.640 5+ $530.480 10+ $514.320 25+ $479.320 50+ $455.080 | Min: 1 / Mult: 1 | 500ft | DPST-NO, DPST-NC | 120V | 6A | 24V | 2.8A | 2CCP Series | |||||
Each | 1+ $1,129.700 5+ $711.720 25+ $643.920 | Min: 1 / Mult: 1 | 500ft | DPST-NO, DPST-NC | 120V | 6A | 24V | 2.8A | 2CCP Series | |||||
Each | 1+ $670.090 25+ $606.270 | Min: 10 / Mult: 1 | 500ft | DPST-NO, DPST-NC | 120V | 6A | 24V | 2.8A | 2CCP Series | |||||
Each | 1+ $691.030 5+ $670.610 10+ $650.180 25+ $605.930 50+ $575.290 | Min: 1 / Mult: 1 | 500ft | DPST-NO, DPST-NC | 120V | 6A | 24V | 2.8A | 2CCP Series | |||||
Each | 1+ $632.080 5+ $613.400 10+ $594.720 25+ $554.240 50+ $526.220 | Min: 1 / Mult: 1 | 500ft | DPST-NO, DPST-NC | 120V | 6A | 24V | 2.8A | 2CCP Series | |||||
Each | 1+ $587.870 5+ $570.490 10+ $553.120 25+ $515.470 50+ $489.410 | Min: 1 / Mult: 1 | 500ft | DPST-NO, DPST-NC | 120V | 6A | 24V | 2.8A | 2CCP Series | |||||
Each | 1+ $587.870 5+ $570.490 10+ $553.120 25+ $515.470 50+ $489.410 | Min: 1 / Mult: 1 | 500ft | DPST-NO, DPST-NC | 120V | 6A | 24V | 2.8A | 2CCP Series | |||||
Each | 1+ $732.300 5+ $710.660 10+ $689.010 25+ $642.120 50+ $609.650 | Min: 1 / Mult: 1 | 500ft | DPST-NO, DPST-NC | 120V | 6A | 24V | 2.8A | 2CCP Series | |||||
Each | 1+ $587.870 5+ $570.490 10+ $553.120 25+ $515.470 50+ $489.410 | Min: 1 / Mult: 1 | 500ft | DPST-NO, DPST-NC | 120V | 6A | 24V | 2.8A | 2CCP Series | |||||
Each | 1+ $1,166.470 5+ $734.880 25+ $664.880 | Min: 1 / Mult: 1 | 500ft | DPST-NO, DPST-NC | 120V | 6A | 24V | 2.8A | 2CCP Series | |||||
Each | 1+ $711.660 5+ $690.620 10+ $669.590 25+ $624.010 50+ $592.460 | Min: 1 / Mult: 1 | 500ft | DPST-NO, DPST-NC | 120V | 6A | 24V | 2.8A | 2CCP Series | |||||
Each | 1+ $801.360 5+ $777.680 10+ $753.990 25+ $702.670 50+ $667.140 | Min: 1 / Mult: 1 | 500ft | DPST-NO, DPST-NC | 120V | 6A | 24V | 2.8A | 2CCP Series | |||||
Each | 1+ $1,271.920 5+ $801.320 25+ $724.990 | Min: 1 / Mult: 1 | 500ft | DPST-NO, DPST-NC | 120V | 6A | 24V | 2.8A | 2CCP Series | |||||
Each | 1+ $691.030 5+ $670.610 10+ $650.180 25+ $605.930 50+ $575.290 | Min: 1 / Mult: 1 | 500ft | DPST-NO, DPST-NC | 120V | 6A | 24V | 2.8A | 2CCP Series | |||||
Each | 1+ $587.870 5+ $570.490 10+ $553.120 25+ $515.470 50+ $489.410 | Min: 1 / Mult: 1 | 500ft | DPST-NO, DPST-NC | 120V | 6A | 24V | 2.8A | 2CCP Series | |||||
Each | 1+ $711.660 5+ $690.620 10+ $669.590 25+ $624.010 50+ $592.460 | Min: 1 / Mult: 1 | 500ft | DPST-NO, DPST-NC | 120V | 6A | 24V | 2.8A | 2CCP Series | |||||
Each | 1+ $733.640 5+ $711.960 10+ $690.270 25+ $643.290 50+ $610.770 | Min: 1 / Mult: 1 | 500ft | DPST-NO, DPST-NC | 120V | 6A | 24V | 2.8A | 2CCP Series | |||||
Each | 1+ $732.300 5+ $710.660 10+ $689.010 25+ $642.120 50+ $609.650 | Min: 1 / Mult: 1 | 500ft | DPST-NO, DPST-NC | 120V | 6A | 24V | 2.8A | 2CCP Series | |||||
Each | 1+ $649.740 5+ $630.540 10+ $611.330 25+ $569.720 50+ $540.920 | Min: 1 / Mult: 1 | 500ft | DPST-NO, DPST-NC | 120V | 6A | 24V | 2.8A | 2CCP Series | |||||
38AJ0193 | Each | 5+ $535.510 10+ $519.200 25+ $483.860 50+ $459.390 | Min: 5 / Mult: 5 | 500ft | DPST-NO, DPST-NC | 120V | 6A | 24V | 2.8A | 2CCP Series | ||||
Each | 1+ $1,207.140 5+ $1,134.490 10+ $1,100.950 25+ $1,067.420 50+ $1,017.130 | Min: 1 / Mult: 1 | 500ft | DPST-NO, DPST-NC | 120V | 6A | 24V | 2.8A | 2CCP Series | |||||



