Test Lead Sets

: 166 Products Found
Filter Layout:

Contract pricing display is unavailable at the moment. Prices shown are standard retail prices, orders placed will have contract pricing applied when processed.

Filter Applied
Filters Applied
{0}
{1}
= {0} : Multiple Values
 
Compare Selected Compare Add Selected Add
Extended Attributes Attributes
Add properties to the table

Select the properties you would like to see added to the columns at the end of the table.

  Manufacturer Part No Newark Part No. Manufacturer / Description
Avail Price for:
Price
Quantity
Test Connector Type A Test Connector Type B Voltage Rating Current Rating Insulator Colour Lead Length - Metric Lead Length - Imperial No. of Test Leads Product Range
 
 
Sort Acending Sort Decending Sort Acending Sort Decending Sort Acending Sort Decending Sort Acending Sort Decending Sort Acending Sort Decending Sort Acending Sort Decending Sort Acending Sort Decending Sort Acending Sort Decending Sort Acending Sort Decending
TL75
TL75 - Test Lead Set, Test Tip Probe to 4mm Right Angle Banana Plug, 1 kV, 10 A, 1.22 m, 2 Leads

44F622

FLUKE - Test Lead Set, Test Tip Probe to 4mm Right Angle Banana Plug, 1 kV, 10 A, 1.22 m, 2 Leads

Test Connector Type A Test Tip Probe
Test Connector Type B 4mm Right Angle Banana Plug, Shrouded
Voltage Rating 1kV

+ See all product info

FLUKE 

Test Lead Set, Test Tip Probe to 4mm Right Angle Banana Plug, 1 kV, 10 A, 1.22 m, 2 Leads

+ Check Stock & Lead Times

927 in stock for same day shipping: Order before 8pm EST Standard Shipping (Mon – Fri. Excluding National Holidays)

More stock available week commencing 2/5/18

Test Connector Type A Test Tip Probe
Test Connector Type B 4mm Right Angle Banana Plug, Shrouded
Voltage Rating 1kV
Current Rating 10A
Insulator Colour Black, Red
Lead Length - Metric 1.22m
Lead Length - Imperial 48"
No. of Test Leads 2
Product Range -

927

1+ $23.40 Price For Web only price

Qty

927 in stock

+ Check Stock & Lead Times

927 in stock for same day shipping: Order before 8pm EST Standard Shipping (Mon – Fri. Excluding National Holidays)

More stock available week commencing 2/5/18

Each

1+ $23.40 Web only price

Add
Min: 1 Mult: 1
Test Tip Probe 4mm Right Angle Banana Plug, Shrouded 1kV 10A Black, Red 1.22m 48" 2 -
21-350
21-350 - Test Lead Set, Alligator Clip, Alligator Clip, Black, Green, Red, White, Yellow, 609.6 mm

38C9114

TENMA - Test Lead Set, Alligator Clip, Alligator Clip, Black, Green, Red, White, Yellow, 609.6 mm

Test Connector Type A Alligator Clip
Test Connector Type B Alligator Clip
Insulator Colour Black, Green, Red, White, Yellow

+ See all product info

TENMA 

Test Lead Set, Alligator Clip, Alligator Clip, Black, Green, Red, White, Yellow, 609.6 mm

+ Check Stock & Lead Times

508 in stock for same day shipping: Order before 8pm EST Standard Shipping (Mon – Fri. Excluding National Holidays)

More stock available week commencing 2/26/18

Test Connector Type A Alligator Clip
Test Connector Type B Alligator Clip
Voltage Rating -
Current Rating -
Insulator Colour Black, Green, Red, White, Yellow
Lead Length - Metric 609.6mm
Lead Length - Imperial 24"
No. of Test Leads 10
Product Range -

508

1+ $6.99 Price For 10+ $6.79 Price For 25+ $6.59 Price For 50+ $6.49 Price For

Qty

508 in stock

+ Check Stock & Lead Times

508 in stock for same day shipping: Order before 8pm EST Standard Shipping (Mon – Fri. Excluding National Holidays)

More stock available week commencing 2/26/18

Each

1+ $6.99 10+ $6.79 25+ $6.59 50+ $6.49

Add
Min: 1 Mult: 1
Alligator Clip Alligator Clip - - Black, Green, Red, White, Yellow 609.6mm 24" 10 -
21-355
21-355 - Test Lead Set, Alligator Clip, Alligator Clip, Black, Green, Red, White, Yellow, 609.6 mm

29C2761

TENMA - Test Lead Set, Alligator Clip, Alligator Clip, Black, Green, Red, White, Yellow, 609.6 mm

Test Connector Type A Alligator Clip
Test Connector Type B Alligator Clip
Insulator Colour Black, Green, Red, White, Yellow

+ See all product info

TENMA 

Test Lead Set, Alligator Clip, Alligator Clip, Black, Green, Red, White, Yellow, 609.6 mm

+ Check Stock & Lead Times

413 in stock for same day shipping: Order before 8pm EST Standard Shipping (Mon – Fri. Excluding National Holidays)

More stock available week commencing 2/26/18

Test Connector Type A Alligator Clip
Test Connector Type B Alligator Clip
Voltage Rating -
Current Rating -
Insulator Colour Black, Green, Red, White, Yellow
Lead Length - Metric 609.6mm
Lead Length - Imperial 24"
No. of Test Leads 10
Product Range -

413

1+ $9.99 Price For 10+ $8.70 Price For 25+ $8.36 Price For 50+ $8.31 Price For

Qty

413 in stock

+ Check Stock & Lead Times

413 in stock for same day shipping: Order before 8pm EST Standard Shipping (Mon – Fri. Excluding National Holidays)

More stock available week commencing 2/26/18

Each

1+ $9.99 10+ $8.70 25+ $8.36 50+ $8.31

Add
Min: 1 Mult: 1
Alligator Clip Alligator Clip - - Black, Green, Red, White, Yellow 609.6mm 24" 10 -
TL71
TL71 - Test Lead Set, Test Tip Probe to 4mm Right Angle Banana Plug, 1 kV, 10 A, 2 Leads

94B7832

FLUKE - Test Lead Set, Test Tip Probe to 4mm Right Angle Banana Plug, 1 kV, 10 A, 2 Leads

Test Connector Type A Test Tip Probe
Test Connector Type B 4mm Right Angle Banana Plug, Shrouded
Voltage Rating 1kV

+ See all product info

FLUKE 

Test Lead Set, Test Tip Probe to 4mm Right Angle Banana Plug, 1 kV, 10 A, 2 Leads

+ Check Stock & Lead Times

421 in stock for same day shipping: Order before 8pm EST Standard Shipping (Mon – Fri. Excluding National Holidays)

More stock available week commencing 2/19/18

Test Connector Type A Test Tip Probe
Test Connector Type B 4mm Right Angle Banana Plug, Shrouded
Voltage Rating 1kV
Current Rating 10A
Insulator Colour Black, Red
Lead Length - Metric -
Lead Length - Imperial -
No. of Test Leads 2
Product Range -

421

1+ $27.90 Price For Web only price

Qty

421 in stock

+ Check Stock & Lead Times

421 in stock for same day shipping: Order before 8pm EST Standard Shipping (Mon – Fri. Excluding National Holidays)

More stock available week commencing 2/19/18

Each

1+ $27.90 Web only price

Add
Min: 1 Mult: 1
Test Tip Probe 4mm Right Angle Banana Plug, Shrouded 1kV 10A Black, Red - - 2 -
21-3315
21-3315 - Test Lead Set, Alligator Clip, Alligator Clip, Black, Green, Red, White, Yellow, 609.6 mm

38C9113

TENMA - Test Lead Set, Alligator Clip, Alligator Clip, Black, Green, Red, White, Yellow, 609.6 mm

Test Connector Type A Alligator Clip
Test Connector Type B Alligator Clip
Insulator Colour Black, Green, Red, White, Yellow

+ See all product info

TENMA 

Test Lead Set, Alligator Clip, Alligator Clip, Black, Green, Red, White, Yellow, 609.6 mm

+ Check Stock & Lead Times

385 in stock for same day shipping: Order before 8pm EST Standard Shipping (Mon – Fri. Excluding National Holidays)

More stock available week commencing 2/26/18

Test Connector Type A Alligator Clip
Test Connector Type B Alligator Clip
Voltage Rating -
Current Rating -
Insulator Colour Black, Green, Red, White, Yellow
Lead Length - Metric 609.6mm
Lead Length - Imperial 24"
No. of Test Leads 10
Product Range -

385

1+ $8.99 Price For 10+ $7.99 Price For 25+ $7.50 Price For 50+ $6.00 Price For

Qty

385 in stock

+ Check Stock & Lead Times

385 in stock for same day shipping: Order before 8pm EST Standard Shipping (Mon – Fri. Excluding National Holidays)

More stock available week commencing 2/26/18

Each

1+ $8.99 10+ $7.99 25+ $7.50 50+ $6.00

Add
Min: 1 Mult: 1
Alligator Clip Alligator Clip - - Black, Green, Red, White, Yellow 609.6mm 24" 10 -
5953A
5953A - Test Lead Set, Test Tip Probe to 4mm Right Angle Banana Plug, 600 V, 3 A, 1.219 m, 2 Leads

29C9527

POMONA - Test Lead Set, Test Tip Probe to 4mm Right Angle Banana Plug, 600 V, 3 A, 1.219 m, 2 Leads

Test Connector Type A Test Tip Probe
Test Connector Type B 4mm Right Angle Banana Plug, Shrouded
Voltage Rating 600V

+ See all product info

POMONA 

Test Lead Set, Test Tip Probe to 4mm Right Angle Banana Plug, 600 V, 3 A, 1.219 m, 2 Leads

+ Check Stock & Lead Times

366 in stock for same day shipping: Order before 8pm EST Standard Shipping (Mon – Fri. Excluding National Holidays)

More stock available week commencing 2/5/18

Test Connector Type A Test Tip Probe
Test Connector Type B 4mm Right Angle Banana Plug, Shrouded
Voltage Rating 600V
Current Rating 3A
Insulator Colour Black, Red
Lead Length - Metric 1.219m
Lead Length - Imperial 48"
No. of Test Leads 2
Product Range -

366

1+ $28.83 Price For

Qty

366 in stock

+ Check Stock & Lead Times

366 in stock for same day shipping: Order before 8pm EST Standard Shipping (Mon – Fri. Excluding National Holidays)

More stock available week commencing 2/5/18

Each

1+ $28.83

Add
Min: 1 Mult: 1
Test Tip Probe 4mm Right Angle Banana Plug, Shrouded 600V 3A Black, Red 1.219m 48" 2 -
72-9340
72-9340 - Test Lead Set, Test Tip Probe to 4mm Right Angle Banana Plug, 1 kV, 10 A, 1.2 m, 2 Leads

86T2027

TENMA - Test Lead Set, Test Tip Probe to 4mm Right Angle Banana Plug, 1 kV, 10 A, 1.2 m, 2 Leads

Test Connector Type A Test Tip Probe
Test Connector Type B 4mm Right Angle Banana Plug, Shrouded
Voltage Rating 1kV

+ See all product info

TENMA 

Test Lead Set, Test Tip Probe to 4mm Right Angle Banana Plug, 1 kV, 10 A, 1.2 m, 2 Leads

+ Check Stock & Lead Times

323 in stock for same day shipping: Order before 8pm EST Standard Shipping (Mon – Fri. Excluding National Holidays)

More stock available week commencing 2/12/18

Test Connector Type A Test Tip Probe
Test Connector Type B 4mm Right Angle Banana Plug, Shrouded
Voltage Rating 1kV
Current Rating 10A
Insulator Colour Black, Red
Lead Length - Metric 1.2m
Lead Length - Imperial 46.8"
No. of Test Leads 2
Product Range -

323

1+ $4.49 Price For Web only price

Qty

323 in stock

+ Check Stock & Lead Times

323 in stock for same day shipping: Order before 8pm EST Standard Shipping (Mon – Fri. Excluding National Holidays)

More stock available week commencing 2/12/18

Each

1+ $4.49 Web only price

Add
Min: 1 Mult: 1
Test Tip Probe 4mm Right Angle Banana Plug, Shrouded 1kV 10A Black, Red 1.2m 46.8" 2 -
21-1190
21-1190 - Test Lead Set, 4mm Banana Plug to Alligator Clip, 0.91 m, 2 Leads

50B5074

TENMA - Test Lead Set, 4mm Banana Plug to Alligator Clip, 0.91 m, 2 Leads

Test Connector Type A Alligator Clip
Test Connector Type B 4mm Banana Plug
Insulator Colour Black, Red

+ See all product info

TENMA 

Test Lead Set, 4mm Banana Plug to Alligator Clip, 0.91 m, 2 Leads

+ Check Stock & Lead Times

22 in stock for same day shipping: Order before 8pm EST Standard Shipping (Mon – Fri. Excluding National Holidays)

More stock available week commencing 2/26/18

Test Connector Type A Alligator Clip
Test Connector Type B 4mm Banana Plug
Voltage Rating -
Current Rating -
Insulator Colour Black, Red
Lead Length - Metric 914.4mm
Lead Length - Imperial 36"
No. of Test Leads 2
Product Range -

22

1+ $5.29 Price For 10+ $4.89 Price For 25+ $4.29 Price For 50+ $3.92 Price For

Qty

22 in stock

+ Check Stock & Lead Times

22 in stock for same day shipping: Order before 8pm EST Standard Shipping (Mon – Fri. Excluding National Holidays)

More stock available week commencing 2/26/18

Each

1+ $5.29 10+ $4.89 25+ $4.29 50+ $3.92

Add
Min: 1 Mult: 1
Alligator Clip 4mm Banana Plug - - Black, Red 914.4mm 36" 2 -
TL175
TL175 - Test Lead Set, Test Tip Probe to 4mm Right Angle Banana Plug, 1 kV, 10 A, 2 Leads

73R7393

FLUKE - Test Lead Set, Test Tip Probe to 4mm Right Angle Banana Plug, 1 kV, 10 A, 2 Leads

Test Connector Type A Test Tip Probe
Test Connector Type B 4mm Right Angle Banana Plug, Shrouded
Voltage Rating 1kV

+ See all product info

FLUKE 

Test Lead Set, Test Tip Probe to 4mm Right Angle Banana Plug, 1 kV, 10 A, 2 Leads

+ Check Stock & Lead Times

261 in stock for same day shipping: Order before 8pm EST Standard Shipping (Mon – Fri. Excluding National Holidays)

  • 20 Further stock expected to ship on Jan 30, 2018
  • More stock available week commencing 2/5/18

    Test Connector Type A Test Tip Probe
    Test Connector Type B 4mm Right Angle Banana Plug, Shrouded
    Voltage Rating 1kV
    Current Rating 10A
    Insulator Colour Black, Red
    Lead Length - Metric -
    Lead Length - Imperial -
    No. of Test Leads 2
    Product Range -

    261

    1+ $27.90 Price For Web only price

    Qty

    261 in stock

    + Check Stock & Lead Times

    261 in stock for same day shipping: Order before 8pm EST Standard Shipping (Mon – Fri. Excluding National Holidays)

  • 20 Further stock expected to ship on Jan 30, 2018
  • More stock available week commencing 2/5/18

    Each

    1+ $27.90 Web only price

    Add
    Min: 1 Mult: 1
    Test Tip Probe 4mm Right Angle Banana Plug, Shrouded 1kV 10A Black, Red - - 2 -
    12-1655-0000
    12-1655-0000 - Test Lead Set, Alligator Clip to Alligator Clip, 558.8 mm, 5 Leads

    84H1075

    GC ELECTRONICS - Test Lead Set, Alligator Clip to Alligator Clip, 558.8 mm, 5 Leads

    Test Connector Type A Alligator Clip
    Test Connector Type B Alligator Clip
    Lead Length - Metric 558.8mm

    + See all product info

    GC ELECTRONICS 

    Test Lead Set, Alligator Clip to Alligator Clip, 558.8 mm, 5 Leads

    + Check Stock & Lead Times

    255 in stock for same day shipping: Order before 8pm EST Standard Shipping (Mon – Fri. Excluding National Holidays)

    More stock available week commencing 2/12/18

    Test Connector Type A Alligator Clip
    Test Connector Type B Alligator Clip
    Voltage Rating -
    Current Rating -
    Insulator Colour -
    Lead Length - Metric 558.8mm
    Lead Length - Imperial 22"
    No. of Test Leads 5
    Product Range -

    255

    1+ $5.48 Price For 5+ $5.38 Price For 10+ $5.22 Price For 25+ $5.19 Price For 50+ $5.12 Price For 100+ $5.06 Price For 250+ $4.96 Price For 500+ $4.71 Price For More Pricing...

    Qty

    255 in stock

    + Check Stock & Lead Times

    255 in stock for same day shipping: Order before 8pm EST Standard Shipping (Mon – Fri. Excluding National Holidays)

    More stock available week commencing 2/12/18

    Each

    1+ $5.48 5+ $5.38 10+ $5.22 25+ $5.19 50+ $5.12 100+ $5.06 250+ $4.96 500+ $4.71 More Pricing...

    Add
    Min: 1 Mult: 1
    Alligator Clip Alligator Clip - - - 558.8mm 22" 5 -
    21-605
    21-605 - Test Lead Set, BNC Plug, Alligator Clip, Black, Red, 990.6 mm

    51B404

     
    New product

    TENMA - Test Lead Set, BNC Plug, Alligator Clip, Black, Red, 990.6 mm

    Test Connector Type A BNC Plug
    Test Connector Type B Alligator Clip
    Insulator Colour Black, Red

    + See all product info

    TENMA 

    Test Lead Set, BNC Plug, Alligator Clip, Black, Red, 990.6 mm New

    + Check Stock & Lead Times

    209 in stock for same day shipping: Order before 8pm EST Standard Shipping (Mon – Fri. Excluding National Holidays)

    More stock available week commencing 2/26/18

     
    Test Connector Type A BNC Plug
    Test Connector Type B Alligator Clip
    Voltage Rating -
    Current Rating -
    Insulator Colour Black, Red
    Lead Length - Metric 990.6mm
    Lead Length - Imperial 39"
    No. of Test Leads 2
    Product Range -

    209

    1+ $4.07 Price For 5+ $3.75 Price For 10+ $3.44 Price For 20+ $3.13 Price For 50+ $2.82 Price For

    Qty

    209 in stock

    + Check Stock & Lead Times

    209 in stock for same day shipping: Order before 8pm EST Standard Shipping (Mon – Fri. Excluding National Holidays)

    More stock available week commencing 2/26/18

    Each

    1+ $4.07 5+ $3.75 10+ $3.44 20+ $3.13 50+ $2.82

    Add
    Min: 1 Mult: 1
    BNC Plug Alligator Clip - - Black, Red 990.6mm 39" 2 -
    1008
    1008 - Alligator Clip Test Leads, 12 Piece Set, Color Coded Vinyl, Heavy 22AWG Copper Wire,  1/4

    53W5644

    ADAFRUIT - Alligator Clip Test Leads, 12 Piece Set, Color Coded Vinyl, Heavy 22AWG Copper Wire, 1/4" Clips

    190 in stock

    + Check Stock & Lead Times

    190 in stock for same day shipping: Order before 8pm EST Standard Shipping (Mon – Fri. Excluding National Holidays)

    More stock available week commencing 4/9/18

    Each

    1+ $3.95

    Add
    Min: 1 Mult: 1
    - - - - - - - - -
    21-2235
    21-2235 - Test Lead Set, Banana Plug Stackable, Banana Plug Stackable, Black, Red, 914 mm

    38C8845

    TENMA - Test Lead Set, Banana Plug Stackable, Banana Plug Stackable, Black, Red, 914 mm

    Test Connector Type A Banana Plug Stackable
    Test Connector Type B Banana Plug Stackable
    Insulator Colour Black, Red

    + See all product info

    TENMA 

    Test Lead Set, Banana Plug Stackable, Banana Plug Stackable, Black, Red, 914 mm

    + Check Stock & Lead Times

    132 in stock for same day shipping: Order before 8pm EST Standard Shipping (Mon – Fri. Excluding National Holidays)

    More stock available week commencing 2/26/18

    Test Connector Type A Banana Plug Stackable
    Test Connector Type B Banana Plug Stackable
    Voltage Rating -
    Current Rating -
    Insulator Colour Black, Red
    Lead Length - Metric 914mm
    Lead Length - Imperial 3ft
    No. of Test Leads 2
    Product Range -

    132

    1+ $4.39 Price For 10+ $4.29 Price For 25+ $4.20 Price For 50+ $4.13 Price For

    Qty

    132 in stock

    + Check Stock & Lead Times

    132 in stock for same day shipping: Order before 8pm EST Standard Shipping (Mon – Fri. Excluding National Holidays)

    More stock available week commencing 2/26/18

    Each

    1+ $4.39 10+ $4.29 25+ $4.20 50+ $4.13

    Add
    Min: 1 Mult: 1
    Banana Plug Stackable Banana Plug Stackable - - Black, Red 914mm 3ft 2 -
    TL224
    TL224 - Test Lead Set, 4mm Banana Plug to 4mm Right Angle Banana Plug, 1 kV, 10 A, 1.5 m, 2 Leads

    81C8007

    FLUKE - Test Lead Set, 4mm Banana Plug to 4mm Right Angle Banana Plug, 1 kV, 10 A, 1.5 m, 2 Leads

    Test Connector Type A 4mm Banana Plug, Shrouded
    Test Connector Type B 4mm Right Angle Banana Plug, Shrouded
    Voltage Rating 1kV

    + See all product info

    FLUKE 

    Test Lead Set, 4mm Banana Plug to 4mm Right Angle Banana Plug, 1 kV, 10 A, 1.5 m, 2 Leads

    + Check Stock & Lead Times

    155 in stock for same day shipping: Order before 8pm EST Standard Shipping (Mon – Fri. Excluding National Holidays)

  • 90 Further stock expected to ship on Jan 30, 2018
  • More stock available week commencing 2/5/18

    Test Connector Type A 4mm Banana Plug, Shrouded
    Test Connector Type B 4mm Right Angle Banana Plug, Shrouded
    Voltage Rating 1kV
    Current Rating 10A
    Insulator Colour Black, Red
    Lead Length - Metric 1.5m
    Lead Length - Imperial 58.8"
    No. of Test Leads 2
    Product Range -

    155

    1+ $27.90 Price For Web only price

    Qty

    155 in stock

    + Check Stock & Lead Times

    155 in stock for same day shipping: Order before 8pm EST Standard Shipping (Mon – Fri. Excluding National Holidays)

  • 90 Further stock expected to ship on Jan 30, 2018
  • More stock available week commencing 2/5/18

    Each

    1+ $27.90 Web only price

    Add
    Min: 1 Mult: 1
    4mm Banana Plug, Shrouded 4mm Right Angle Banana Plug, Shrouded 1kV 10A Black, Red 1.5m 58.8" 2 -
    TL-5A
    TL-5A - Test Lead Set, 4mm Banana Plug to Alligator Clip, 5 A, 1 m, 2 Leads

    13C3253

    B&K PRECISION - Test Lead Set, 4mm Banana Plug to Alligator Clip, 5 A, 1 m, 2 Leads

    Test Connector Type A 4mm Banana Plug
    Test Connector Type B Alligator Clip
    Current Rating 5A

    + See all product info

    B&K PRECISION 

    Test Lead Set, 4mm Banana Plug to Alligator Clip, 5 A, 1 m, 2 Leads

    + Check Stock & Lead Times

    146 in stock for same day shipping: Order before 8pm EST Standard Shipping (Mon – Fri. Excluding National Holidays)

    More stock available week commencing 3/12/18

    Test Connector Type A 4mm Banana Plug
    Test Connector Type B Alligator Clip
    Voltage Rating -
    Current Rating 5A
    Insulator Colour Black, Red
    Lead Length - Metric 1m
    Lead Length - Imperial 39.6"
    No. of Test Leads 2
    Product Range -

    146

    1+ $10.00 Price For

    Qty

    146 in stock

    + Check Stock & Lead Times

    146 in stock for same day shipping: Order before 8pm EST Standard Shipping (Mon – Fri. Excluding National Holidays)

    More stock available week commencing 3/12/18

    Each

    1+ $10.00

    Add
    Min: 1 Mult: 1
    4mm Banana Plug Alligator Clip - 5A Black, Red 1m 39.6" 2 -
    46-400
    46-400 - Test Lead Set, Alligator Clip to Alligator Clip, 610 mm, 10 Leads

    66K9094

    AIM CAMBRIDGE - CINCH CONNECTIVITY - Test Lead Set, Alligator Clip to Alligator Clip, 610 mm, 10 Leads

    Test Connector Type A Alligator Clip
    Test Connector Type B Alligator Clip
    Lead Length - Metric 610mm

    + See all product info

    AIM CAMBRIDGE - CINCH CONNECTIVITY 

    Test Lead Set, Alligator Clip to Alligator Clip, 610 mm, 10 Leads

    + Check Stock & Lead Times

    140 in stock for same day shipping: Order before 8pm EST Standard Shipping (Mon – Fri. Excluding National Holidays)

    More stock available week commencing 3/5/18

    Test Connector Type A Alligator Clip
    Test Connector Type B Alligator Clip
    Voltage Rating -
    Current Rating -
    Insulator Colour -
    Lead Length - Metric 610mm
    Lead Length - Imperial 24"
    No. of Test Leads 10
    Product Range -

    140

    1+ $7.88 Price For 10+ $7.65 Price For 25+ $7.20 Price For 50+ $6.98 Price For 100+ $6.53 Price For 250+ $6.39 Price For More Pricing...

    Qty

    140 in stock

    + Check Stock & Lead Times

    140 in stock for same day shipping: Order before 8pm EST Standard Shipping (Mon – Fri. Excluding National Holidays)

    More stock available week commencing 3/5/18

    Pack of 10

    1+ $7.88 10+ $7.65 25+ $7.20 50+ $6.98 100+ $6.53 250+ $6.39 More Pricing...

    Add
    Min: 1 Mult: 1
    Alligator Clip Alligator Clip - - - 610mm 24" 10 -
    BU-00287
    BU-00287 - Test Lead Set, Insulated Mini, Alligator Clip to Alligator Clip, 300 V, 7 A, 304.8 mm, 10 Leads

    83F8070

    MUELLER ELECTRIC - Test Lead Set, Insulated Mini, Alligator Clip to Alligator Clip, 300 V, 7 A, 304.8 mm, 10 Leads

    Test Connector Type A Alligator Clip
    Test Connector Type B Alligator Clip
    Voltage Rating 300V

    + See all product info

    MUELLER ELECTRIC 

    Test Lead Set, Insulated Mini, Alligator Clip to Alligator Clip, 300 V, 7 A, 304.8 mm, 10 Leads

    + Check Stock & Lead Times

    109 in stock for same day shipping: Order before 8pm EST Standard Shipping (Mon – Fri. Excluding National Holidays)

    More stock available week commencing 2/12/18

    Test Connector Type A Alligator Clip
    Test Connector Type B Alligator Clip
    Voltage Rating 300V
    Current Rating 7A
    Insulator Colour -
    Lead Length - Metric 304.8mm
    Lead Length - Imperial 12"
    No. of Test Leads 10
    Product Range -

    109

    1+ $6.32 Price For Web only price 100+ $5.89 Price For Web only price 500+ $5.50 Price For Web only price 1000+ $5.07 Price For Web only price 2500+ $4.62 Price For Web only price

    Qty

    109 in stock

    + Check Stock & Lead Times

    109 in stock for same day shipping: Order before 8pm EST Standard Shipping (Mon – Fri. Excluding National Holidays)

    More stock available week commencing 2/12/18

    Each

    1+ $6.32 Web only price 100+ $5.89 Web only price 500+ $5.50 Web only price 1000+ $5.07 Web only price 2500+ $4.62 Web only price

    Add
    Min: 1 Mult: 1
    Alligator Clip Alligator Clip 300V 7A - 304.8mm 12" 10 -
    5519A
    5519A - Test Lead Set, Test Tip Probe to 4mm Right Angle Banana Plug, 1 kV, 10 A, 1.22 m, 2 Leads

    90F2354

    POMONA - Test Lead Set, Test Tip Probe to 4mm Right Angle Banana Plug, 1 kV, 10 A, 1.22 m, 2 Leads

    Test Connector Type A Test Tip Probe
    Test Connector Type B 4mm Right Angle Banana Plug, Shrouded
    Voltage Rating 1kV

    + See all product info

    POMONA 

    Test Lead Set, Test Tip Probe to 4mm Right Angle Banana Plug, 1 kV, 10 A, 1.22 m, 2 Leads

    + Check Stock & Lead Times

    110 in stock for same day shipping: Order before 8pm EST Standard Shipping (Mon – Fri. Excluding National Holidays)

    More stock available week commencing 2/5/18

    Test Connector Type A Test Tip Probe
    Test Connector Type B 4mm Right Angle Banana Plug, Shrouded
    Voltage Rating 1kV
    Current Rating 10A
    Insulator Colour Black, Red
    Lead Length - Metric 1.22m
    Lead Length - Imperial 48"
    No. of Test Leads 2
    Product Range -

    110

    1+ $18.53 Price For

    Qty

    110 in stock

    + Check Stock & Lead Times

    110 in stock for same day shipping: Order before 8pm EST Standard Shipping (Mon – Fri. Excluding National Holidays)

    More stock available week commencing 2/5/18

    Each

    1+ $18.53

    Add
    Min: 1 Mult: 1
    Test Tip Probe 4mm Right Angle Banana Plug, Shrouded 1kV 10A Black, Red 1.22m 48" 2 -
    3782-36-02
    3782-36-02 - Test Lead Set, Minigrabber, Hook Clip to 4mm Banana Plug, 60 VDC, 5 A, 914 mm, 2 Leads

    30C4758

    POMONA - Test Lead Set, Minigrabber, Hook Clip to 4mm Banana Plug, 60 VDC, 5 A, 914 mm, 2 Leads

    Test Connector Type A Hook Clip
    Test Connector Type B 4mm Stackable Banana Plug
    Voltage Rating 60VDC

    + See all product info

    POMONA 

    Test Lead Set, Minigrabber, Hook Clip to 4mm Banana Plug, 60 VDC, 5 A, 914 mm, 2 Leads

    + Check Stock & Lead Times

    84 in stock for same day shipping: Order before 8pm EST Standard Shipping (Mon – Fri. Excluding National Holidays)

  • 45 Further stock expected to ship on Jan 30, 2018
  • More stock available week commencing 2/5/18

    Test Connector Type A Hook Clip
    Test Connector Type B 4mm Stackable Banana Plug
    Voltage Rating 60VDC
    Current Rating 5A
    Insulator Colour Black, Red
    Lead Length - Metric 914mm
    Lead Length - Imperial 36"
    No. of Test Leads 2
    Product Range Model 3782 Series

    84

    1+ $14.32 Price For 25+ $13.72 Price For 50+ $12.69 Price For 100+ $12.34 Price For 200+ $11.92 Price For 500+ $11.40 Price For More Pricing...

    Qty

    84 in stock

    + Check Stock & Lead Times

    84 in stock for same day shipping: Order before 8pm EST Standard Shipping (Mon – Fri. Excluding National Holidays)

  • 45 Further stock expected to ship on Jan 30, 2018
  • More stock available week commencing 2/5/18

    Each

    1+ $14.32 25+ $13.72 50+ $12.69 100+ $12.34 200+ $11.92 500+ $11.40 More Pricing...

    Add
    Min: 1 Mult: 1
    Hook Clip 4mm Stackable Banana Plug 60VDC 5A Black, Red 914mm 36" 2 Model 3782 Series
    685P
    685P - Test Lead Set, Test Tip Probe to 4mm Right Angle Banana Plug, 1.066 m, 2 Leads

    44F8972

    ABBATRON HH SMITH - Test Lead Set, Test Tip Probe to 4mm Right Angle Banana Plug, 1.066 m, 2 Leads

    Test Connector Type A Test Tip Probe
    Test Connector Type B 4mm Right Angle Banana Plug
    Insulator Colour Black, Red

    + See all product info

    ABBATRON HH SMITH 

    Test Lead Set, Test Tip Probe to 4mm Right Angle Banana Plug, 1.066 m, 2 Leads

    + Check Stock & Lead Times

    91 in stock for same day shipping: Order before 8pm EST Standard Shipping (Mon – Fri. Excluding National Holidays)

  • 18 Further stock expected to ship on Feb 19, 2018
  • More stock available week commencing 2/26/18

    Test Connector Type A Test Tip Probe
    Test Connector Type B 4mm Right Angle Banana Plug
    Voltage Rating -
    Current Rating -
    Insulator Colour Black, Red
    Lead Length - Metric 1.066m
    Lead Length - Imperial 42"
    No. of Test Leads 2
    Product Range -

    91

    1+ $25.21 Price For

    Qty

    91 in stock

    + Check Stock & Lead Times

    91 in stock for same day shipping: Order before 8pm EST Standard Shipping (Mon – Fri. Excluding National Holidays)

  • 18 Further stock expected to ship on Feb 19, 2018
  • More stock available week commencing 2/26/18

    Each

    1+ $25.21

    Add
    Min: 1 Mult: 1
    Test Tip Probe 4mm Right Angle Banana Plug - - Black, Red 1.066m 42" 2 -
    72-9310
    72-9310 - Test Lead Set, Test Tip Probe to 4mm Right Angle Banana Plug, 1 kV, 991 mm, 2 Leads

    86T2021

    TENMA - Test Lead Set, Test Tip Probe to 4mm Right Angle Banana Plug, 1 kV, 991 mm, 2 Leads

    Test Connector Type A Test Tip Probe
    Test Connector Type B 4mm Right Angle Banana Plug, Shrouded
    Voltage Rating 1kV

    + See all product info

    TENMA 

    Test Lead Set, Test Tip Probe to 4mm Right Angle Banana Plug, 1 kV, 991 mm, 2 Leads

    + Check Stock & Lead Times

    61 in stock for same day shipping: Order before 8pm EST Standard Shipping (Mon – Fri. Excluding National Holidays)

  • 500 Further stock expected to ship on Feb 7, 2018
  • More stock available week commencing 3/12/18

    Test Connector Type A Test Tip Probe
    Test Connector Type B 4mm Right Angle Banana Plug, Shrouded
    Voltage Rating 1kV
    Current Rating -
    Insulator Colour Black, Red
    Lead Length - Metric 991mm
    Lead Length - Imperial 39"
    No. of Test Leads 2
    Product Range -

    61

    1+ $9.99 Price For

    Qty

    61 in stock

    + Check Stock & Lead Times

    61 in stock for same day shipping: Order before 8pm EST Standard Shipping (Mon – Fri. Excluding National Holidays)

  • 500 Further stock expected to ship on Feb 7, 2018
  • More stock available week commencing 3/12/18

    Each

    1+ $9.99

    Add
    Min: 1 Mult: 1
    Test Tip Probe 4mm Right Angle Banana Plug, Shrouded 1kV - Black, Red 991mm 39" 2 -
    21-2240
    21-2240 - Test Lead Set, Banana Plug Stackable, Banana Plug Stackable, Black, Red, 1.83 m

    38C8846

    TENMA - Test Lead Set, Banana Plug Stackable, Banana Plug Stackable, Black, Red, 1.83 m

    Test Connector Type A Banana Plug Stackable
    Test Connector Type B Banana Plug Stackable
    Insulator Colour Black, Red

    + See all product info

    TENMA 

    Test Lead Set, Banana Plug Stackable, Banana Plug Stackable, Black, Red, 1.83 m

    + Check Stock & Lead Times

    55 in stock for same day shipping: Order before 8pm EST Standard Shipping (Mon – Fri. Excluding National Holidays)

  • 500 Further stock expected to ship on Feb 22, 2018
  • More stock available week commencing 2/26/18

    Test Connector Type A Banana Plug Stackable
    Test Connector Type B Banana Plug Stackable
    Voltage Rating -
    Current Rating -
    Insulator Colour Black, Red
    Lead Length - Metric 1.83m
    Lead Length - Imperial 6ft
    No. of Test Leads 2
    Product Range -

    55

    1+ $4.35 Price For Web only price 10+ $4.14 Price For Web only price 25+ $3.76 Price For Web only price 50+ $3.57 Price For Web only price

    Qty

    55 in stock

    + Check Stock & Lead Times

    55 in stock for same day shipping: Order before 8pm EST Standard Shipping (Mon – Fri. Excluding National Holidays)

  • 500 Further stock expected to ship on Feb 22, 2018
  • More stock available week commencing 2/26/18

    Each

    1+ $4.35 Web only price 10+ $4.14 Web only price 25+ $3.76 Web only price 50+ $3.57 Web only price

    Add
    Min: 1 Mult: 1
    Banana Plug Stackable Banana Plug Stackable - - Black, Red 1.83m 6ft 2 -
    6275
    6275 - Test Lead Set, Test Tip Probe to 4mm Right Angle Banana Plug, 1 kV, 3 A, 1 m, 2 Leads

    91B1291

    POMONA - Test Lead Set, Test Tip Probe to 4mm Right Angle Banana Plug, 1 kV, 3 A, 1 m, 2 Leads

    Test Connector Type A Test Tip Probe
    Test Connector Type B 4mm Right Angle Stackable Banana Plug, Shrouded
    Voltage Rating 1kV

    + See all product info

    POMONA 

    Test Lead Set, Test Tip Probe to 4mm Right Angle Banana Plug, 1 kV, 3 A, 1 m, 2 Leads

    + Check Stock & Lead Times

    78 in stock for same day shipping: Order before 8pm EST Standard Shipping (Mon – Fri. Excluding National Holidays)

  • 14 Further stock expected to ship on Jan 30, 2018
  • More stock available week commencing 2/5/18

    Test Connector Type A Test Tip Probe
    Test Connector Type B 4mm Right Angle Stackable Banana Plug, Shrouded
    Voltage Rating 1kV
    Current Rating 3A
    Insulator Colour Black, Red
    Lead Length - Metric 1m
    Lead Length - Imperial 39.6"
    No. of Test Leads 2
    Product Range -

    78

    1+ $26.77 Price For

    Qty

    78 in stock

    + Check Stock & Lead Times

    78 in stock for same day shipping: Order before 8pm EST Standard Shipping (Mon – Fri. Excluding National Holidays)

  • 14 Further stock expected to ship on Jan 30, 2018
  • More stock available week commencing 2/5/18

    Each

    1+ $26.77

    Add
    Min: 1 Mult: 1
    Test Tip Probe 4mm Right Angle Stackable Banana Plug, Shrouded 1kV 3A Black, Red 1m 39.6" 2 -
    5907A
    5907A - Test Lead Set, 4mm Banana Plug to 4mm Right Angle Banana Plug, 1 kV, 10 A, 1.219 m, 2 Leads

    95F1291

    POMONA - Test Lead Set, 4mm Banana Plug to 4mm Right Angle Banana Plug, 1 kV, 10 A, 1.219 m, 2 Leads

    Test Connector Type A 4mm Banana Plug, Shrouded
    Test Connector Type B 4mm Right Angle Banana Plug, Shrouded
    Voltage Rating 1kV

    + See all product info

    POMONA 

    Test Lead Set, 4mm Banana Plug to 4mm Right Angle Banana Plug, 1 kV, 10 A, 1.219 m, 2 Leads

    + Check Stock & Lead Times

    75 in stock for same day shipping: Order before 8pm EST Standard Shipping (Mon – Fri. Excluding National Holidays)

    More stock available week commencing 2/5/18

    Test Connector Type A 4mm Banana Plug, Shrouded
    Test Connector Type B 4mm Right Angle Banana Plug, Shrouded
    Voltage Rating 1kV
    Current Rating 10A
    Insulator Colour Black, Red
    Lead Length - Metric 1.219m
    Lead Length - Imperial 48"
    No. of Test Leads 2
    Product Range -

    75

    1+ $15.44 Price For

    Qty

    75 in stock

    + Check Stock & Lead Times

    75 in stock for same day shipping: Order before 8pm EST Standard Shipping (Mon – Fri. Excluding National Holidays)

    More stock available week commencing 2/5/18

    Pack of 2

    1+ $15.44

    Add
    Min: 1 Mult: 1
    4mm Banana Plug, Shrouded 4mm Right Angle Banana Plug, Shrouded 1kV 10A Black, Red 1.219m 48" 2 -
    21-555
    21-555 - Test Lead Set, Banana Plug, Test Clip, Black, Red, 914 mm

    38C8843

    TENMA - Test Lead Set, Banana Plug, Test Clip, Black, Red, 914 mm

    Test Connector Type A Banana Plug
    Test Connector Type B Test Clip
    Insulator Colour Black, Red

    + See all product info

    TENMA 

    Test Lead Set, Banana Plug, Test Clip, Black, Red, 914 mm

    + Check Stock & Lead Times

    52 in stock for same day shipping: Order before 8pm EST Standard Shipping (Mon – Fri. Excluding National Holidays)

  • 200 Further stock expected to ship on Feb 21, 2018
  • More stock available week commencing 2/26/18

    Test Connector Type A Banana Plug
    Test Connector Type B Test Clip
    Voltage Rating -
    Current Rating -
    Insulator Colour Black, Red
    Lead Length - Metric 914mm
    Lead Length - Imperial 36"
    No. of Test Leads 2
    Product Range -

    52

    1+ $6.99 Price For 10+ $6.89 Price For 25+ $6.53 Price For 50+ $6.05 Price For

    Qty

    52 in stock

    + Check Stock & Lead Times

    52 in stock for same day shipping: Order before 8pm EST Standard Shipping (Mon – Fri. Excluding National Holidays)

  • 200 Further stock expected to ship on Feb 21, 2018
  • More stock available week commencing 2/26/18

    Each

    1+ $6.99 10+ $6.89 25+ $6.53 50+ $6.05

    Add
    Min: 1 Mult: 1
    Banana Plug Test Clip - - Black, Red 914mm 36" 2 -